이중속 체인 조립 라인 25

工装板线
March 31, 2025
Category Connection: 이중 속도 체인 조립 라인
Brief: Discover the Fully Automatic Assembly Production Line For Energy Storage Batteries, designed for high-throughput and labor-saving operations. This double-speed chain assembly line features smart material handling, integrated laser welding, and automated thermal interface application for precision and efficiency. Perfect for small to large products, it ensures accurate and stable conveying with intelligent control options. Upgrade your production today!
Related Product Features:
  • Fully automated from cell stacking to final pack testing, reducing manpower by 90%.
  • Smart AGV-fed component supply with 99.9% delivery accuracy.
  • Integrated laser welding with real-time seam tracking for precision.
  • Automated thermal interface application with ±5% thickness tolerance.
  • 100% in-line electrical performance validation for quality assurance.
  • Customizable frame material, workboard size, and worktable height.
  • Accurate and stable conveying speed, adjustable from 0-12M/MIN.
  • Option for intelligent control and on-site installation services.
자주 묻는 질문:
  • What are the competitive advantages of this assembly line?
    The assembly line offers a labor-saving design with 90% manpower reduction, smart AGV-fed material handling with 99.9% delivery accuracy, and integrated laser welding with real-time seam tracking for precision.
  • Can the production line handle different product sizes?
    Yes, the transmission capacity can carry small, medium, and large products, and the workboard size and height are customizable to meet specific needs.
  • What support services do you provide with the production line?
    We offer on-site installation services, a complete line plan, and a full line layout plan tailored to your factory's requirements. Customization options are also available for frame material, workboard size, and more.
Related Videos

ESD 작업판-3

工作台
April 07, 2025

벨트 컨베이어 라인 9

皮带传输线
March 20, 2025

ESD 작업판-13

工作台
April 07, 2025

벨트 컨베이어 라인 12

皮带传输线
March 20, 2025

ESD 작업판-15

工作台
April 07, 2025

ESD 작업판-14

工作台
April 07, 2025