벨트 조립 라인 2

皮带组装线
March 20, 2025
Category Connection: 벨트 조립 라인
Brief: Discover the Smartphone Function Phone Assembly Production Line, a high-precision automated solution for manufacturing smartphones and feature phones. This modular line integrates robotic automation and AI quality control for 99.8% defect-free output at 120 units/hour. Perfect for Industry 4.0-ready production.
Related Product Features:
  • Micro-Precision Robotics handle components as small as 0.2mm for flawless assembly.
  • 6-Stage AOI Inspection detects PCB/SMD defects in real-time for superior quality control.
  • Integrated 5G Testing Module ensures RF performance validation during production.
  • Quick-Change Platform allows model conversion in under 15 minutes for flexible manufacturing.
  • Industry 4.0 Ready with cloud-based production monitoring for seamless operations.
  • Supports 4"-7" screen sizes and is ISO 14644 Class 5 cleanroom compatible.
  • 30% space savings compared to conventional assembly lines for efficient facility use.
  • Includes free DFM analysis with prototype build for optimized production setup.
자주 묻는 질문:
  • What is the production capacity of the Smartphone Function Phone Assembly Production Line?
    The production line achieves a high output of 120 units per hour with 99.8% defect-free quality.
  • How quickly can the assembly line switch between different phone models?
    The Quick-Change Platform enables model conversion in less than 15 minutes for flexible manufacturing.
  • What quality control features are included in the assembly line?
    The line features 6-Stage AOI Inspection for real-time defect detection and integrated 5G testing for RF performance validation.
  • Is the assembly line compatible with cleanroom standards?
    Yes, it is ISO 14644 Class 5 cleanroom compatible, ensuring high standards for sensitive manufacturing environments.
Related Videos

벨트 조립 라인 12

皮带组装线
March 20, 2025

벨트 조립 라인 11

皮带组装线
March 20, 2025

벨트 조립 라인 10

皮带组装线
March 20, 2025

ESD 작업판-3

工作台
April 07, 2025

벨트 컨베이어 라인 9

皮带传输线
March 20, 2025

ESD 작업판-13

工作台
April 07, 2025

벨트 컨베이어 라인 12

皮带传输线
March 20, 2025

ESD 작업판-15

工作台
April 07, 2025